Tidewell Sourcing
Sign in

Quality inspection: what we check

How a pre-shipment inspection works, AQL sampling explained, and what the report contains.

When. The inspection takes place when at least 80% of the order is finished and packed, so that what we see is what will ship.

Sampling. We use the AQL tables (ISO 2859-1, general level II). For 3,000 pieces, the inspector opens cartons at random and checks 125 pieces. Defects are sorted as critical (unsafe), major (unusable or unsellable) and minor. A usual limit is 0 critical, 2.5 major and 4.0 minor.

What is checked. Quantity and carton count; look and finish against the approved sample; sizes and weight; function tests (a lamp lights at each setting, a bottle does not leak upside down for four hours); logo position and colour; labels, barcodes and warnings in your language; carton marks, drop test of one carton.

The report. Sent within 24 hours: pass, fail or pending, every defect with a photo, measurements, and the inspector's notes. You decide whether to pay the balance, ask for rework or a new inspection.

After a failed report, the factory sorts or reworks the goods and we inspect again; the factory often pays for the second visit if the contract says so.